68 Days Is Normal for Haymarket Units. This One Took 21.
What Does a Brand-New 5-Bedroom Duplex Need on Install Day? 2 Trucks, 5 People, Done by Midday.
68 Square Metres. A Street Full of Identical One-Bedrooms. One Day to Make This One Different.
One Bedroom, Four Zones, Four Hours. A Coogee Top Floor Goes to Auction in 11 Days.
What Happens to a 331 sqm Terrace With Nothing In It? Staged by 3pm. Listed the Next Morning.
123 Square Metres. Three Zones. One Morning in Rozelle.
The Column in the Middle of the Room Became the Wall. Sold in 14 Days.
What Happens When Staging Starts the Morning After the Tenant Leaves? 5 Days to Sold.
29 Days From Staging to Sold. Waterloo’s Unit Median Is 38. One Director, One Day.
Kurraba Point. 23 Days to Auction. One Room Staged as Three.
$125,000 Above the Blacktown Median. Two Living Rooms Had to Justify It.