The short answer
Setting up a display apartment with Goldpac Home Staging takes four short steps and one day on site: send the project, meet on site for about twenty minutes, approve a written room-by-room proposal, and Goldpac installs the whole display in one day before your first open day. After that the hire runs for at least six months, with one invoice a month, damaged pieces replaced within 48 hours, and about 30 days' notice before the agreed end date so you can extend or let the furniture be collected. The date that drives everything is the launch; book as soon as you know it.
Key takeaways
- Goldpac's display setup: project details, a twenty-minute site meeting, a fixed written proposal, then a one-day install.
- The install is scheduled backwards from the first open day, not forwards from the signature.
- The minimum term is six months: a three-month package, then monthly hire invoiced in advance.
- About 30 days before the agreed end date, Goldpac sends the next month's invoice; confirm it to extend at the same rate, or the furniture is collected on the date in the Service Order.

Jones Street, Ultimo: the campaign dates were fixed first and the install was booked to finish two days before launch.
Step 1: Send the project — what Goldpac needs to start
Three details are enough to begin: the address, the apartments to furnish and your launch or display opening date. Renders, a floor plan and a line on the target buyer help the stylist arrive prepared, but they are not needed to book the meeting. The enquiry goes through the form on the Goldpac developer page or straight to info@goldpac.com.au, and Valentin replies by email to set up a time on site.
Either the developer or the project marketing agency can start the process and sign. The Service Order names the company that pays and its ABN, and GST is added to every invoice.
Step 2: The twenty-minute site meeting
Valentin and Maria, Goldpac's lead stylist, walk the display with you. The meeting covers what a floor plan cannot: the light at the times buyers will visit, the true width of the living room once the walkway to the balcony is counted, the view from each window, the finishes, and the site logistics for install day — lift, loading point, keys. It takes about twenty minutes because the questions are specific.
If the apartment is still being finished, the meeting can happen before completion. The plan can be written early; the install is booked once the apartment is clean and the trades are out.
Step 3: The written proposal — plan, term and price
After the meeting Goldpac sends a fixed proposal in writing: a room-by-room furniture plan, the term and the monthly price. The price is taken from the published table, with any larger suites or extra zones quoted, and it does not change after you sign.
| Display apartment | First 3 months | Each month after | Six months in total |
|---|---|---|---|
| 1 bedroom | $2,300 | $700 | $4,400 |
| 2 bedrooms | $2,800 | $850 | $5,350 |
| 3 bedrooms | $3,500 | $1,060 | $6,680 |
| 4 bedrooms | $4,500 | $1,365 | $8,595 |
| 5 bedrooms | $5,500 | $1,670 | $10,510 |
All prices +GST. The three-month package is paid before installation; monthly hire is invoiced in advance. For what to check in any display furniture contract before you sign, see 8 things to check before you sign a display furniture hire.
Step 4: Install day — one day, scheduled backwards from launch
The install date is set by the first open day. Goldpac works backwards from it, leaving a buffer so nothing is placed in a rush, and installs the whole display in one day with its own furniture, trucks and crew from the Castle Hill warehouse. Because the plan is approved beforehand, install day is execution, not decision-making.
On Jones Street, Ultimo, the campaign dates for a 285-square-metre penthouse were fixed before the install was booked: listing live on a Friday, first open the following Wednesday, auction four weeks later. Goldpac booked the install for the Wednesday before, 8am to 12pm, so the home was finished two days before launch. On Killara Avenue, Kingsgrove, keys arrived on a Monday morning and a brand-new five-bedroom duplex — living, formal dining, kitchen styling, the covered alfresco and the bedrooms — was staged the same afternoon.

Junee Crescent, Kingsgrove: two trucks, a crew of five, one stylist — the whole duplex staged by midday.
Months 1 to 6: what happens during the hire?
The display works hardest at weekends, and wear shows by month four if nobody looks after it. Under Goldpac's hire:
- Damaged pieces are replaced within 48 hours, on Goldpac's own truck from Castle Hill.
- Refresh visits — dusting, fresh flowers, new artwork — are booked whenever you want them and quoted per visit. A project might book one before each price release or second launch.
- One invoice a month, in advance, at the rate in the Service Order.
- Access to inspect, refresh and collect is agreed in writing before installation, including after settlement or handover of the building.
The end of the term: extend or collect
About 30 days before the agreed end date, Goldpac sends the next month's invoice. Confirm it in writing and the hire continues at the same rate; there is no new contract and no increase for staying longer. Leave it, and the furniture is collected on the date in the Service Order. If the hire ends before the six-month minimum, the rest of the minimum term is payable.
That 30-day point exists because display timelines move. A sales period planned for six months can run to ten, and the last apartments in a completed building can take longer than the first thirty. The display stays as long as it is selling.

Killara Avenue, Kingsgrove: a rust curved sofa gave one living zone a character of its own, so the stone-floored rooms never read as the same room twice.
How far ahead should you book?
As soon as you know your launch date. The install itself takes one day, so the constraint is rarely Goldpac's crew; it is getting the site meeting and the plan done while there is still time to change the brief. A sensible sequence for most projects:
| When | What |
|---|---|
| Launch date confirmed | Send the project; book the site meeting |
| After the site meeting | Written proposal: plan, term, price; approve and sign |
| Builder confirms completion | Lock the install date in writing, after the final clean |
| Install day | Display staged in one day |
| First open day | A buffer after install; the sales team takes over |
| About 30 days before the end date | Next month's invoice arrives; extend or let it be collected |
When does this timeline not fit?
- A display needed for under six months. For one finished apartment listed with an agent, Goldpac's standard staging package with 12 weeks of furniture hire is usually a better fit — see the fixed staging prices.
- A launch with no date. The plan can be written, but the install cannot be locked until the building is finished and the doors have a date.
- A display furnished as part of a fit-out contract. Large sales centres with bespoke joinery may have their furniture supplied by the fit-out company.
Proof spotlight
Ultimo · Jones Street · 3-bedroom penthouse, 285 square metres, three terraces · staged Wednesday 28 October, 8am–12pm · listed Friday 30 October · first open Wednesday 4 November.
The dates were set first and the install was booked to land two days before launch. Inside, the living zone was built as an island where two walls of glass meet, on a wave-edged cream rug that told buyers where the room ended on a reflective stone floor. Outside, each terrace was given one job. This was a sale campaign for an agent, not a developer display; display hire brings the same scheduling and the same stylist to your project.
Full case in the Goldpac portfolio → Ultimo Penthouse. 285 Square Metres. Three Terraces. Staged by Noon.
FAQ
How long does it take to set up a display apartment?
The install takes one day. Before it, Goldpac needs the project details, a twenty-minute site meeting and your approval of the written room-by-room proposal. The install is then scheduled backwards from your first open day, after the final clean, with a buffer so nothing is rushed.
What is the minimum hire term for display furniture?
Six months: a three-month package paid before installation, then monthly hire invoiced in advance. If the hire ends earlier, the rest of the minimum term is payable. After six months the hire continues month by month at the same rate for as long as the display is open.
What happens when the display closes?
Goldpac collects the furniture on the end date in the Service Order. About 30 days before that date, Goldpac sends the next month's invoice; confirm it in writing and the hire continues at the same rate. There is no new contract to sign for an extension.
Can we book the site meeting before the building is finished?
Yes. The site meeting and the written furniture plan can happen before completion, so the brief is settled early. The install date is locked once the builder confirms the display apartment is finished and the final clean is booked, because furniture goes in after the trades, never before.
Who do we deal with from booking to collection?
One contact: Valentin, from the first meeting to collection. Maria, Goldpac's lead stylist, plans the furniture and directs the install. The crew, trucks and furniture are Goldpac's own, from the Castle Hill warehouse, so there are no subcontractors to coordinate.
Key facts
- Goldpac Home Staging (Goldpac PTY LTD, ABN 45 679 634 130) — property staging and display apartment furniture hire, Castle Hill, Sydney.
- 600+ Sydney homes staged since August 2024; own furniture, warehouse and trucks.
- Display hire: published prices from $4,400 +GST for six months on a one-bedroom display — full table at goldpac.com.au/for-developers
- Minimum term six months: a three-month package paid before installation, then monthly hire invoiced in advance.
- One-day installation before the first open day; damaged pieces replaced within 48 hours.
- Send the project address, the apartments to furnish and the launch date: info@goldpac.com.au · +61 475 151 245
Have a launch date? Send the address, the apartments to furnish and the date, and Valentin will reply by email to arrange a twenty-minute walk-through on site.
Related reading: installing a display on a live construction site, what a display apartment furniture package includes, room by room, 8 things to check before you sign a display furniture hire, display suite styling: 7 jobs a long-term hire takes off the developer's desk and display apartment furniture hire vs buying: the 6-month cost. Or browse the Goldpac portfolio of staged Sydney homes.
Updated November 2026.